Capture & Ingest
Records land in CEDX ERP already linked to the canonical customer, employee, or vendor ID.
180 orders at $2.51M open value, 60 BOMs with cost rolled up per revision, 140 work orders with the shortage flagged on the row. Then the two boards most systems hide: 90 MRP exceptions priced at $356K, and a close-risk panel that caught 18 unposted journals before period P08 ended.
"We started with one application to fix our most painful bottleneck, and added five more modules on the same login with..."
| Facility / Supply Node | Work Order / Shipment Lot | Operations Lead | Valuation / Throughput | Cycle & Dock SLA | Quality Score |
|---|---|---|---|---|---|
| Newark Distribution Hub A1CEDX ERP · Record #1040 | LOT-7741 · Cold-Chain SKUs | J. Miller · Ops Director | $1,840,000 Stock | ● 99.4% On-Time Dock | Zero Defects |
| Detroit Assembly Line 03CEDX ERP · Record #1041 | WO-33910 · BOM Rev 4.2 | H. Takahashi · Plant Lead | 4,200 Units / Wk | ● 14m Setup Variance | 99.8% Yield |
| Pacific Freight CorridorCEDX ERP · Record #1042 | SHP-88201 · 18 Containers | C. Morales · Logistics | $920,000 Cargo | ● Customs Cleared | Tracked Live |
| Vendor PO ConsolidationCEDX ERP · Record #1043 | PO-55109 · Tier-1 Suppliers | E. Kowalski · Procurement | $640,000 Committed | ● 3-Way Match Passed | 100% Compliant |
The Overview lists the unposted journals at $1.92M next to the work order blocking close. A system that argues with itself on screen is one you can check.
Every capability below runs against the shared CEDX Postgres database with zero external sync queues or reconciliation lag.
The order book is a table, not a summary: order, customer, status, lines, amount, fill %, due and GL code on every row. SO-22100 sits Held at $92K with fill at 3%; the fulfilled rows say 100. Open value across the 105 open and held orders is $2.51M.
Every parent carries its component count, rollup cost, scrap %, revision and lead time. CTL-4400, the edge controller the whole demo estate runs on, rolls up at $420 across 14 components at revision R7, and the scrap column flags the pro sensor assembly at 4.6%.
The SHORT column answers the question a planner actually asks: WO-441, building CTL-4400, is Held at 35% progress with Short = Yes, and the shortage-only filter isolates all 31 blocked rows. 72 orders are open on the plant at $364K of cost.
Every figure below is directly inspectable in the running CEDX ERP application workspace with zero synthetic projections.
Click any screen below to inspect how CEDX ERP moves from initial intake to verified cross-estate completion.
Six cards (orders 180, booked $3.36M, fill rate 42%, work orders 140, MRP exceptions 90 at $356K, close risk 61 with 27 high) and an ops-health ring that reads 34 because of them. Each alert arrives symptom, cause, fix: the SNS-IR-90 shortage blocks WO-441 at $18K, with short 80 against demand 82 spelled out.
Every barcode scan on the warehouse floor updates inventory valuation, procurement reorder points, and customer order promises simultaneously.
Records land in CEDX ERP already linked to the canonical customer, employee, or vendor ID.
Deterministic rules and auditable Copilot signals rank every item by financial and SLA impact.
Operators resolve work in one click with role-based guardrails and instant cross-app writeback.
Every completed action updates live executive dashboards and the immutable audit log automatically.
Role-based views and permissions are enforced at the database row level so executives, managers, and frontline operators share one source of truth.
Owns the Monday review from the same Overview: 90 MRP exceptions priced at $356K, close risk at 61 with 27 high, and the largest open orders on the page.
Works the exceptions board: 31 short work orders, the excess-capital flag on the mailer SKU at $13K, and the shortage that put WO-441 on hold.
The 18 unposted journals in period P08 at $1.92M and the 14-day credit hold on SO-22890 land here before the period ends, not after.
CEDX ERP is not an isolated point tool. It reads and writes the exact same customer, ledger, and identity records as the rest of the CEDX software estate.
CTL-4400's work orders show Held on the floor view with the same component shortage the ERP Overview priced at $18K.
LOT-CTL-8821 sits in quarantine with 48 units shipped, a critical NCR on the same controller the order book is waiting on.
The late pick PK-10482 is an A-class CTL-4400 staged in the wrong reserve. The path delay is root-caused on the floor view.
The 18 unposted journals in P08 are where the ops record meets the ledger.
"We started with one application to fix our most painful bottleneck, and added five more modules on the same login without a single migration project."
"Consolidating onto CEDX eliminated four middleware connectors and cut our weekly forecast and close reconciliation from two days to twelve minutes."
"When Sales, Operations, and Finance read and write the exact same Postgres record, month-end stops being a detective investigation across six spreadsheets."
Drag the seat slider to compare your current stitched stack (SAP EWM + Manhattan Associates + Coupa + Samsara + Arena PLM) against running CEDX ERP natively on the unified CEDX estate.
Explore the live CEDX ERP workspace on canonical demo data at /app/erp, or book a 30-minute architecture session to map your first entity rollout.
Instant browser access to CEDX ERP pre-loaded with canonical demo records and connected across the 132-application CEDX estate.