Capture & Ingest
Records land in CEDX Manufacturing already linked to the canonical customer, employee, or vendor ID.
320 work orders, 213 of them open at $2.18M of remaining value. OEE 67.9% across 12 stations, scrap logged at $153K, 36 orders past due, and a dispatch board where 25 of 90 slots have already slipped, named by shift and station.
"Our operators actually enjoy opening the workspace. Every screen is fast, legible, and grounded in live production dat..."
| Facility / Supply Node | Work Order / Shipment Lot | Operations Lead | Valuation / Throughput | Cycle & Dock SLA | Quality Score |
|---|---|---|---|---|---|
| Newark Distribution Hub A1CEDX Manufacturing · Record #1040 | LOT-7741 · Cold-Chain SKUs | J. Miller · Ops Director | $1,840,000 Stock | ● 99.4% On-Time Dock | Zero Defects |
| Detroit Assembly Line 03CEDX Manufacturing · Record #1041 | WO-33910 · BOM Rev 4.2 | H. Takahashi · Plant Lead | 4,200 Units / Wk | ● 14m Setup Variance | 99.8% Yield |
| Pacific Freight CorridorCEDX Manufacturing · Record #1042 | SHP-88201 · 18 Containers | C. Morales · Logistics | $920,000 Cargo | ● Customs Cleared | Tracked Live |
| Vendor PO ConsolidationCEDX Manufacturing · Record #1043 | PO-55109 · Tier-1 Suppliers | E. Kowalski · Procurement | $640,000 Committed | ● 3-Way Match Passed | 100% Compliant |
WO-24083 is held with 22 of 200 scrapped in reflow zone 3, and the alert prices the boards at $44K. That is the difference between a dashboard and a floor record.
Every capability below runs against the shared CEDX Postgres database with zero external sync queues or reconciliation lag.
Plan, done, scrap and can-build sit on every row. WO-24094, the CTL-4400 edge controller, is in progress at 122 of 148; WO-24032 is Held Critical on the IR sensor with 2 scrapped. 65 rows are material-short with coverage under 100%, and the filter counts them.
The schedule runs Day, Swing and Night shifts across stations, with plan hours against load hours per slot. One row runs at 104% load and shows it in red; 25 slots say Slipped and need resequence.
42 active revisions average 5.1 component lines at a $214 rollup. The IR sensor module carries five revisions in view, C.1 through B.1, each with its own lines, rollup and scrap %, so an engineering change is a row, not a rework meeting.
Every figure below is directly inspectable in the running CEDX Manufacturing application workspace with zero synthetic projections.
Click any screen below to inspect how CEDX Manufacturing moves from initial intake to verified cross-estate completion.
Cards for work orders, OEE, open value, late orders, scrap and in-progress. Then the part that matters: highest OEE risk by station, priced. SMT-A runs at 65 with $44K behind it; KIT-01 is the healthiest at 73.7 and still carries $14K.
Every barcode scan on the warehouse floor updates inventory valuation, procurement reorder points, and customer order promises simultaneously.
Records land in CEDX Manufacturing already linked to the canonical customer, employee, or vendor ID.
Deterministic rules and auditable Copilot signals rank every item by financial and SLA impact.
Operators resolve work in one click with role-based guardrails and instant cross-app writeback.
Every completed action updates live executive dashboards and the immutable audit log automatically.
Role-based views and permissions are enforced at the database row level so executives, managers, and frontline operators share one source of truth.
Starts the shift on the schedule view: 24 slots running, 25 slipped, load at 77%, and resequences before the 104% row becomes a missed order.
Works the 65 material-short rows: coverage under 100% on the field kit before its work order goes Held at $4.6K.
Owns the 48 recipes (five revisions of the IR sensor in view, scrap % per rev) and the SMT-A reflow spike the alert priced at $44K.
CEDX Manufacturing is not an isolated point tool. It reads and writes the exact same customer, ledger, and identity records as the rest of the CEDX software estate.
The component shortage holding WO-441 on the floor is priced on the ERP overview at $18K: same record, two views.
Scrap and fails land as NCRs: the reboot-loop NCR-2271 on CTL-4400 at $55K is the same controller this schedule builds.
The 65 material-short rows start as inventory: bins with velocity and waste scores on the warehouse floor.
Stations on the schedule are assets on the register: a down heater is 28 hours of open downtime and an emergency work order there.
"Our operators actually enjoy opening the workspace. Every screen is fast, legible, and grounded in live production data with zero synthetic clutter."
"Having identity, least-privilege access, audit trails, and business applications on one kernel cut our security review and provisioning time by 82%."
"We started with one application to fix our most painful bottleneck, and added five more modules on the same login without a single migration project."
Drag the seat slider to compare your current stitched stack (SAP EWM + Manhattan Associates + Coupa + Samsara + Arena PLM) against running CEDX Manufacturing natively on the unified CEDX estate.
Explore the live CEDX Manufacturing workspace on canonical demo data at /app/manufacturing, or book a 30-minute architecture session to map your first entity rollout.
Instant browser access to CEDX Manufacturing pre-loaded with canonical demo records and connected across the 132-application CEDX estate.