Capture & Ingest
Records land in CEDX Projects already linked to the canonical customer, employee, or vendor ID.
Most project tools tell you what slipped last week. Projects watches the active sprint and says what is about to slip: 32 issues blocked across the demo workspace, a carry-over forecast of 22 pts at close, and the exact issue driving it.
"Consolidating onto CEDX eliminated four middleware connectors and cut our weekly forecast and close reconciliation fro..."
| Program / Client Engagement | Milestone & Sprint Phase | Delivery Principal | Budget / Billable Margin | Capacity Utilization | Delivery Health |
|---|---|---|---|---|---|
| Meridian Global ERP RolloutCEDX Projects · Record #1040 | Phase 03 · Data Migration | K. Vance · Principal Architect | $680,000 · 44% Margin | ● 88.5% Billable Util | On Schedule |
| Q4 Core Kernel Release v4.8CEDX Projects · Record #1041 | Sprint 22 · 64 Story Points | A. Rostova · Staff Eng Lead | 18 Engineers Allocated | ● 92.0% Sprint Velocity | Zero Blockers |
| Harbor Retail POS DeploymentCEDX Projects · Record #1042 | 180 Stores · Wave 2 Cutover | M. Okafor · Program Dir | $510,000 · 41% Margin | ● 85.2% Field Capacity | Milestone Billed |
| SOC-2 & ISO Continuous AuditCEDX Projects · Record #1043 | Control Evidence Automation | R. Lin · Security PMO | $140,000 Internal Cap | ● 100% Evidence Linked | Audit Ready |
The slip predictor on the Overview does the arithmetic in the open: “If DATA-904 stays blocked, carry forecast rises from 14 → 24 pts (+71%).” You can argue with a forecast that shows its working.
Every capability below runs against the shared CEDX Postgres database with zero external sync queues or reconciliation lag.
Twelve epics on a Q2 to Q4 2026 timeline, bar = target window, each with status, priority, progress, points and issue count. Seven are in progress, one is blocked; the blocked one, the analytics warehouse cutover, renders in red instead of hiding in an average.
The Sprints screen puts the arithmetic on one line: capacity 48 pts, committed 52 pts, completed 19, scope added 6 mid-sprint. Sprint 42 is over-committed by 4 pts and the product says so in orange, not in a post-mortem.
Scope creep gets a number, not a vibe: 6 pts added mid-sprint in week 32, the fourth consecutive sprint with adds, with a guardrail suggestion, cap scope-adds at 4 pts or require a swap. Each alert arrives root-caused: symptom, cause, fix.
Every figure below is directly inspectable in the running CEDX Projects application workspace with zero synthetic projections.
Click any screen below to inspect how CEDX Projects moves from initial intake to verified cross-estate completion.
251 open issues, 111 in progress, velocity 40 pts over six sprints, 32 blocked and a carry-over forecast of 22 pts. Each card sparklines its own trend. Below, the root-caused alerts name the issue and the points at stake: INV-1123 carry risk 86%, Sprint 42 over-committed +6 pts.
Engineering sprints, consultant timesheets, resource bench capacity, and milestone billing read from the exact same project object.
Records land in CEDX Projects already linked to the canonical customer, employee, or vendor ID.
Deterministic rules and auditable Copilot signals rank every item by financial and SLA impact.
Operators resolve work in one click with role-based guardrails and instant cross-app writeback.
Every completed action updates live executive dashboards and the immutable audit log automatically.
Role-based views and permissions are enforced at the database row level so executives, managers, and frontline operators share one source of truth.
Runs Sprint 42 off the Sprints screen: 52 committed against 48 of capacity, scope adds argued one at a time, carry forecast on the wall at stand-up.
Watches the blocked column and the people behind it: 32 blocked issues is a staffing fact as much as a process one.
Owns the twelve epics and says the blocked one out loud. Progress on the timeline is a target window, and the ledger underneath backs it with points and issue counts.
CEDX Projects is not an isolated point tool. It reads and writes the exact same customer, ledger, and identity records as the rest of the CEDX software estate.
The capacity, commit-risk scoring and carry forecast behind the Sprints screen live in Sprints. Projects reads them, it does not recompute them.
Every key on the board (INV-1123, DATA-904) is an issue with labels, SLA clocks and a workflow, not a card-shaped note.
The twelve epics on the Projects roadmap are initiatives on the portfolio roadmap, with effort and value scores attached there.
The follow-ups that are not issues (renewals, requests, checklists) live in Tasks, against the same people and dates.
"Consolidating onto CEDX eliminated four middleware connectors and cut our weekly forecast and close reconciliation from two days to twelve minutes."
"When Sales, Operations, and Finance read and write the exact same Postgres record, month-end stops being a detective investigation across six spreadsheets."
"Our operators actually enjoy opening the workspace. Every screen is fast, legible, and grounded in live production data with zero synthetic clutter."
Drag the seat slider to compare your current stitched stack (Jira Align + Kantata (Mavenlink) + Asana Enterprise + Float + Tempo) against running CEDX Projects natively on the unified CEDX estate.
Explore the live CEDX Projects workspace on canonical demo data at /app/projects, or book a 30-minute architecture session to map your first entity rollout.
Instant browser access to CEDX Projects pre-loaded with canonical demo records and connected across the 132-application CEDX estate.