A portfolio that scores its own slip.

Roadmap holds the whole portfolio, 320 initiatives, 238 active, 1,608 eng-months of open effort, and grades it: 87 initiatives at high slip risk, a portfolio health of 33, and the worst offender named with its lag in percentage points.

33 portfolio health 106 at risk or off track 48pp lag on the worst slip Zero-ETL Shared Postgres Record
CEDX Roadmap Enterprise Architecture Briefing
CEDX Roadmap · 33 portfolio health

"We started with one application to fix our most painful bottleneck, and added five more modules on the same login with..."

Arjun Patel · SVP of Global Operations · Keystone Logistics · 0.01s Canonical Sync
CEDX Roadmap reads and writes the exact same canonical Postgres record as CEDX Projects, CEDX Sprints, and CEDX Resourcing with zero third-party webhooks.
🔒 https://roadmap.cedxsystems.com/workspace/live
CEDX Roadmap · Overview (The portfolio, graded)
roadmap.cedxsystems.com · 01 Overview · Live Canonical Dataset
● Overview Active · 0.011s Sync Open /app/roadmap ↗
PORTFOLIO HEALTH
33
risk-adjusted · index 75%
AT RISK OR OFF TRACK
106
30 blocked · above the 4-week median
LAG ON THE WORST SLIP
48pp
10 mo initiative · off track
REQUESTS IN 7 DAYS
15
8 enterprise · 7 themes hit
Program / Client Engagement Milestone & Sprint Phase Delivery Principal Budget / Billable Margin Capacity Utilization Delivery Health
Meridian Global ERP RolloutCEDX Roadmap · Record #1040 Phase 03 · Data Migration K. Vance · Principal Architect $680,000 · 44% Margin ● 88.5% Billable Util On Schedule
Q4 Core Kernel Release v4.8CEDX Roadmap · Record #1041 Sprint 22 · 64 Story Points A. Rostova · Staff Eng Lead 18 Engineers Allocated ● 92.0% Sprint Velocity Zero Blockers
Harbor Retail POS DeploymentCEDX Roadmap · Record #1042 180 Stores · Wave 2 Cutover M. Okafor · Program Dir $510,000 · 41% Margin ● 85.2% Field Capacity Milestone Billed
SOC-2 & ISO Continuous AuditCEDX Roadmap · Record #1043 Control Evidence Automation R. Lin · Security PMO $140,000 Internal Cap ● 100% Evidence Linked Audit Ready
✦ CEDX Roadmap Copilot · Meridian Global ERP Rollout
Overview Verified
238 active, 89 in the now horizon, 106 at risk or off track, 30 of them blocked. The health ring reads 33 and the alerts explain it: one initiative slipping at 95% with a 48-point lag, ten teams over 100% capacity, and two P0s near ship with progress ≥ 74%.
CEDX Roadmap operator workspace in natural daylight
FIELD DOCUMENTARY · PROJECTS & DELIVERY

Requests arrive as evidence, not anecdote

The healthiest number on the Overview is the one most tools hide: 106 initiatives at risk or off track, above the 4-week portfolio median. A roadmap that cannot say that sentence is a poster.

CAMERA: CANON EOS R5 · 35MM F/1.4 · NATURAL DAYLIGHT ESTATE ROUTE: /APP/ROADMAP
CORE CAPABILITIES · CEDX ROADMAP

Three architectural jobs CEDX Roadmap gets right on one record.

Every capability below runs against the shared CEDX Postgres database with zero external sync queues or reconciliation lag.

01 · PROJECTS & DELIVERY FOUNDATION

Requests arrive as evidence, not anecdote

Fifteen requests in seven days, eight from enterprise accounts, land in the inbox with the asker, segment and channel attached, then auto-cluster into seven themes. Ops efficiency holds four; each theme lists the initiatives it feeds.

✓ Segments tagged: enterprise · mid-market · SMBVerified
✓ Themes hit: 7, auto-clustered, counts on eachVerified
✓ Every theme links to the initiatives it scoresVerified
02 · LIVE EXECUTION

A ledger, not a slide

320 initiatives as rows: horizon (Now, Next or Later), health, priority, progress, effort, value, theme, owner and target end on every one. The shipped rows stay in the ledger at 100%, so the portfolio has a memory.

A ledger, not a slide
CEDX Roadmap Live Telemetry ● 33 portfolio health
03 · DETERMINISTIC GOVERNANCE

A timeline that caps its own density

Q2 to Q4 2026, bar = target window, and the screen admits its own limit: 40 bars shown of 211 after filters, “cap 40 for density.” Progress sits at the end of each bar, and the at-risk count of 67 is a filter, not a footnote.

✓ 115 initiatives in the now horizonActive
✓ Progress per bar: 9% to 100% in viewActive
✓ The red bars are red: warehouse cutover at 36%Active
04 · VERIFIED DEMO DATASET METRICS

What the live CEDX Roadmap build looks like when you open /app/roadmap.

Every figure below is directly inspectable in the running CEDX Roadmap application workspace with zero synthetic projections.

PORTFOLIO HEALTH
33
risk-adjusted · index 75%
AT RISK OR OFF TRACK
106
30 blocked · above the 4-week medi
LAG ON THE WORST SLIP
48pp
10 mo initiative · off track
REQUESTS IN 7 DAYS
15
8 enterprise · 7 themes hit
4-SCREEN RUNNING BUILD TOUR

Four screens captured from roadmap.cedxsystems.com, in the order operators run them.

Click any screen below to inspect how CEDX Roadmap moves from initial intake to verified cross-estate completion.

01 OVERVIEW
The portfolio, graded
238 active, 89 in the now horizon, 106 at risk or off track, 30 of them blocked. The health ring reads 33 and the alerts explain it: one initiative slipping at 95% with a 48-point lag, ten teams over 100% capacity, and two P0s near ship with progress ≥ 74%.
02 INSIGHTS
What the field is actually asking for
The inbox: scanners that double-scan on dock reconnect, quotes drifting by cents on EU reverse charge, an audit pack blocking a procurement. Each request maps to a theme, and each theme to the initiatives that would answer it: linked clusters currently zero, feeding value scores, shown honestly.
03 INITIATIVES
Every row argues for its slot
The ledger is the portfolio's double-entry book: horizon, health, priority and progress against effort and value. An initiative at 100% progress with effort 9 and value 78 shipped; one at effort 12 and value 40 is a different argument, and the table lets you have it.
04 TIMELINE
The target windows, forty at a time
The Gantt-like view caps itself: top 40 of 211 bars for density, with at-risk and now-horizon as filters. Bars read as target windows, progress at the right edge, and the two red bars are the initiatives the overview is already alerting on.
01 OVERVIEW · ROADMAP.CEDXSYSTEMS.COM

The portfolio, graded

● Live Screen Capture

238 active, 89 in the now horizon, 106 at risk or off track, 30 of them blocked. The health ring reads 33 and the alerts explain it: one initiative slipping at 95% with a 48-point lag, ten teams over 100% capacity, and two P0s near ship with progress ≥ 74%.

✓ Delivered vs planned value units, weekly W1 to W12Verified in /app/roadmap
✓ By health: 132 on track · 73 at risk · 33 off track · 57 shipped · 25 parkedVerified in /app/roadmap
✓ “Do this next” scored from slip × valueVerified in /app/roadmap
The portfolio, graded
OPERATING CADENCE · PROJECTS & DELIVERY

How CEDX Roadmap runs across the week, in the exact order work happens.

Engineering sprints, consultant timesheets, resource bench capacity, and milestone billing read from the exact same project object.

STAGE 01

Capture & Ingest

Records land in CEDX Roadmap already linked to the canonical customer, employee, or vendor ID.

STAGE 02

Score & Triage

Deterministic rules and auditable Copilot signals rank every item by financial and SLA impact.

STAGE 03

Execute & Approve

Operators resolve work in one click with role-based guardrails and instant cross-app writeback.

STAGE 04

Reconcile & Report

Every completed action updates live executive dashboards and the immutable audit log automatically.

OPERATOR WORKSPACES · WHO RUNS CEDX ROADMAP

Three roles open CEDX Roadmap every day. Each sees the exact surface they own.

Role-based views and permissions are enforced at the database row level so executives, managers, and frontline operators share one source of truth.

Product manager using CEDX Roadmap

Product manager

Owns the Now / Next / Later calls and can defend each one with effort, value and the requests behind the theme, not with seniority.

● now horizon · 89
Engineering leadership using CEDX Roadmap

Engineering leadership

Reads the slip board: 87 initiatives at ≥55% slip risk and ten teams over capacity is a staffing and sequencing conversation, held early.

● high slip · 87
Research and insights using CEDX Roadmap

Research and insights

Runs the request inbox: fifteen a week, clustered into themes, linked to initiatives so the value score has evidence under it.

● requests · 15 / 7 days
ONE CANONICAL RECORD ACROSS 132 APPLICATIONS

Every Completed Task Updates Project Margin and Triggers Client Invoicing

CEDX Roadmap is not an isolated point tool. It reads and writes the exact same customer, ledger, and identity records as the rest of the CEDX software estate.

ARCHITECTURAL PROOF · OPERATOR PERSPECTIVES

Why enterprise operators replace stitched SaaS stacks with CEDX Roadmap.

"We started with one application to fix our most painful bottleneck, and added five more modules on the same login without a single migration project."

Arjun Patel
Arjun Patel
SVP of Global Operations · Keystone Logistics

"Consolidating onto CEDX eliminated four middleware connectors and cut our weekly forecast and close reconciliation from two days to twelve minutes."

Marcus Vance
Marcus Vance
Chief Revenue Officer · Meridian Systems

"When Sales, Operations, and Finance read and write the exact same Postgres record, month-end stops being a detective investigation across six spreadsheets."

Elena Rostova
Elena Rostova
Chief Financial Officer · Northline Group
LIVE TCO & CONSOLIDATION MODEL · PROJECTS & DELIVERY

Stop paying five vendors to re-sync the same projects & delivery record.

Drag the seat slider to compare your current stitched stack (Jira Align + Kantata (Mavenlink) + Asana Enterprise + Float + Tempo) against running CEDX Roadmap natively on the unified CEDX estate.

Organization Seats 250 seats
25 seats 500 seats 1,250 seats 2,500 seats
Legacy Stitched Stack
Jira Align + Kantata (Mavenlink) + Asana Enterprise + Float + Tempo
$1,380,000 / yr
CEDX Roadmap + Full Estate Bundle
All 132 applications · Canonical Postgres · Unlimited Copilot
$267,000 / yr
Verified Annual Hard Savings
Plus 0 middleware sync failures
$1,113,000 / yr
TECHNICAL & PROCUREMENT FAQ · CEDX ROADMAP

Questions operators and architecture teams ask before piloting CEDX Roadmap.

01 Is the software on this page real? +
Yes. Every screenshot is a capture of the running build and you can open the same build at /app/roadmap . It runs on demo data.
02 Where do the requests in Insights come from? +
From the channels the field already uses, support, sales and customer success, each with the asker and segment attached. The demo inbox holds 15 from the last 7 days, 8 of them enterprise, clustered into 7 themes.
03 How is slip risk scored? +
Per initiative, against its target window and progress: the top of the board reads 95% with a 48-point lag on a 10-month effort. 87 initiatives sit at ≥55%, and the score feeds the “Do this next” list weighted by value.
04 What does the health score of 33 mean? +
A risk-adjusted reading of the whole portfolio: 89 initiatives in the now horizon against a risk index of 75%. It is deliberately unflattering when the portfolio is over-committed. That is what it is for.
05 Does the timeline show everything at once? +
No, and it says so: the view caps at 40 bars for density out of 211 after filters, with now-horizon and at-risk as one-click filters. The ledger underneath always carries the full 320.
LIVE SANDBOX · ZERO MIDDLEWARE · NO CARD REQUIRED

CEDX Roadmap is running right now. Open it and inspect the record.

Explore the live CEDX Roadmap workspace on canonical demo data at /app/roadmap, or book a 30-minute architecture session to map your first entity rollout.

Open live CEDX Roadmap (/app/roadmap) -> Book an estate architecture map